March, 19, 1982 - Signing of the contract for plant's construction.
September, 14, 1982 - Laying of "the first brick" and capsule with an "appeal to the descendants" into the foundation of the plant.
October, 15, 1984 - Start of the operation of the production facilities of the electric steel melting shop and fabrication of the first heat and its casting with CCM.
November, 4, 1984 - Start of the operation of the production facilities of the rolling mill, and rolling of the first lot of rolled section on mill 320/150.
July, 15, 1985 - Signing by the State Commission the Acceptance Report on putting into operation of the first stage of the plant.
November, 21, 1987 - Start of the operation of:
- secondary metallurgy facilities (furnace-ladle and circulating degasser) and CCM №3 at melt shop;
- complex of medium section rolling mill 850 at the rolling plant;
- facilities of wire shop №1 and production of the first lot of Byelorussian cord.
March, 1, 1991 - Start of the operation of wire shop №2, lime kiln №2, DSF-3 and vacuum degasser at the melt shop.
August, 10, 1995 - The first visit of the President of the Republic of Belarus Lukashenko A.G. to the plant.
August, 1, 1996 - Opening of metallurgical technical school in Zhlobin.
April 1997 - Certification of the product Quality Assurance System in accordance with requirements of an international standard EN DIN ISO 9002:1994
October, 1, 1997 - Opening of the evening branch of Gomel State Polytechnic University named after RO.Sukhoi
October 30, 1998 – opening of Metallurgic Technical School attached to the plant.
September, 15, 2000 – commissioning of a new complex of Wire Mill 150 at the presence of the President of the Republic of Belarus A.G. Lukashenko
November, 30, 2000 – start of the operation of production facilities of Wire Plant - 3
April, 2002 – commissioning of a new brass plating unit at Steel cord and Wire Plant
May, 15, 2002 – commissioning of a new Oxygen Plant
May, 19, 2002 – start of operation of the production facilities of the 2-nd stage of Oxygen Plant
December, 30, 2002 – Nikolay Victorovich Andrianov was appointed General Director of RUE "Byelorussian Steel Works" by the order of Ministry of Industry of the Republic of Belarus
December, 30, 2003 – one million tons of rolled material was produced in Wire Mill 150
September, 25, 2004 – grand opening of an office of Byelorussian – Chinese Joint Venture BELMET (SHANGAI) TRADING Co ., Ltd. in China
October, 15, 2004 – 20th anniversary of Byelorussian Steel Works! Visit of the President of the Republic of Belarus A.G. Lukashenko to BMZ
November, 2004 – a new project of RUE “Byelorussian Steel Works” for construction of Seamless Pipes Mill was approved by the President of the Republic of Belarus A.G. Lukashenko
January, 25–28, 2005 – the first graduation of evening courses of Metallurgic Technical School in Zhlobin
March, 28, 2005 – commissioning of 40 cable machines RI– 10М (after modernization) at Steel cord and Wire Plant – 2
May, 25, 2005 – start of construction of Pipe Rolling Mill.
July, 12, 2005 – production of 200th thousand ton of hose wire at Steel cord and Wire Plant – 2.
December, 22, 2005 – production of 250th thousand ton of hose wire on fine drawing line at Steel cord and Wire Plant - 1
January, 19, 2006 – production of 400th thousand ton of steel cord on the second cabling line at Steel cord and Wire Plant - 1
February, 24, 2006 – brass plating unit No. 6 was put into operation ahead of schedule at Steel cord and Wire Plant - 2
March, 1, 2006 – production of 300th thousand ton of steel cord at Steel cord and Wire Plant – 2 from the date of commissioning
April, 10, 2006 – registration of ice-hockey team “Hockey Club Metallurg – Zhlobin” in the Ministry of Justice of the Republic of Belarus
May, 23, 2006 – ceremonial starting of construction of a new polyclinic at the plant.
May, 29, 2006 – a birthday of ice-hockey club «Metallurg –Zhlobin»
June, 30, 2006 – the jubilee, millionth ton of wire products was produced at Steel cord and Wire Plant – 2
August, 03, 2006 – production of two millionth ton of rolled products in Wire Mill 150 at 10.30 a.m.
August, 16, 2006 – a new line for manufacturing of bronze-plated bead wire was put into operation at Steel cord and Wire Plant - 1
September, 22, 2006 – a solemn ceremony dedicated to 10th anniversary of Metallurgic Technical School in Zhlobin
December, 22, 2006 – an official commissioning at Wire Plant – 3 after completion of modernization project «Dnepr»
February, 19, 2007 – commissioning of equipment for fiber manufacturing at Steel cord and Wire Plant -1
March, 19, 2007 – an International Conference dedicated to the 25th anniversary of signing of the contract for construction of the plant
June, 27, 2007 – production of the first pipe in Pipe Rolling Mill at RUE «BMZ»
July, 13, 2007 – commissioning of Pipe Rolling Mill.
July, 13, 2007 – visit of the President of the Republic of Belarus A.G. Lukashenko to RUE “BMZ” in connection with the commissioning of Pipe Rolling Mill.
September, 12, 2007 – the trial production of pipes with the cycle interval of two minutes. The first batch of pipes with the weight of 14 tons consisting of 50 pieces with diameter 88,9mm and wall thickness 12,5mm was produced.
November, 21, 2007 – 20th anniversary of steel cord and wire production (Steel cord and Wire Plant – 1) and Rolling Mill 850
December, 26, 2007 – a record at Wire Plant – 3, production of 400th thousand ton of wire.
December, 29, 2007 – a grand opening of a new building for engineers and management.
January, 17, 2008 – a grand opening of swimming pool of Olympic Reserve Centre for hockey and swimming.
January, 17, 2008 – a grand opening of aqua park.
February, 2008 – a slitting technology of 2 and 3-strand rolling for production of reinforcing bars of large diameters was applied for the first time on the territory of the former USSR in the Rolling Mill of the plant.
October, 13, 2009 – Byelorussian Steel Works will be headed by Mr. Savenok
March 2009 – modernization of mill 320 finishing line
July 28, 2009 –30 mil tons of steel produced at EMS-1. It took the plant 20 years to manufacture first 20 mil tons of steel (this output was reached in 2004 in honour of the 20th anniversary of BMZ), and the next 10 mil were produced in 5 years. This fact is the evidence of high productive potential of the plant and its labour collective.
July 8, 2009 - 5 years since the formation of the plant’s primary organization of the Byelorussian Republican Youth Union
August 2009 – start of CCM-3 upgrading.
October 9, 2009 – the plant was the first in the republic to submit its corporate social report to be studied by the general public and participants of the UN Global Compact.
October 13, 2009 – Anatoli Savianok was appointed the general director of the PA "Byelorussian Steel Works" – the general director of the RUE "Byelorussian Steel Works"
October 15, 2009 - RUE "BMZ" celebrated its 25th anniversary
November, 2009 – the central plant’s laboratory was accredited by Deutsche Gesellschaft fűr Akkreditierung mbH (DGA), an accreditation organization
November, 2009 - production of concast billet in CCM-1,2 reached 161 108 tons per month.
November 5, 2009 – 25th anniversary of the section rolling mill
December 10, 2009 – During 25-year history of rolling mill 320 its personnel reached the highest working performance – one million ton of the rolled stock per year while the design capacity of the mill is 450 tpy.
December 14, 2009 – A.M. Savianok was appointed the president of the International Union of Metallurgists by its enlarged session.
March 25, 2010– a contract for the erection of the third lime kiln was signed with TECHCOM (Germany).
March 31, 2010 – a commemorative 100th ton of pipes was produced.
April 16, 2010 –150th ton of pipes was rolled in the pipe mill.
July 7- 9, 2010 – 10th commemorative International Scientific and Technical Conference of Young Specialists “Metal 2010” was held.
September 15, 2010 – 10th anniversary of rolling mill 150 commissioning
March 5, 2010 – BMZ was awarded the title of «The best Investor of the Year». The labour collective was awarded a challenge banner and an Honorary Letter of Commendation based on the previous year performance.